Dniprovskiy pipe works offers for delivery Geological prospecting pipes according to TU 14-3-1919-93 and couplings for them according to specification below. |
||||||||||
Pipe Outside diameter D |
Coupling Outside diameter Dм |
Thread internal diameter of coupling dт |
Bore diameter dо |
Bore depth lо |
butt-end width β |
Pipe length L | Coupling weight Kg |
|||
Nominal | extreme deviation | Nominal | extreme deviation | Nominal | extreme deviation | |||||
mm | mm | mm | mm | mm | mm | mm | mm | mm | mm | mm |
42 | +0.9 | 39,667 | 44 | +0.5 | 3 | 2 | 4 | 130 | ±3 | 1,4 |
57 | ||||||||||
-0.6 | ||||||||||
50 | +1.0 | 47,667 | 52 | +0.5 | 3 | 2 | 4 | 140 | ±3 | 1,7 |
65 | ||||||||||
-0.7 | ||||||||||
64 | +1.2 | 60,421 | 65 | +0.5 | 5 | 2 | 6 | 150 | ±3 | 2,9 |
83 | ||||||||||
-0.8 | ||||||||||
Pipe Outside diameter D |
Wall thickness s |
Thread length G |
Upset | Pipe length L |
theoretical weight, kg at density 7.85 |
|||||
Upset butt-end Internal diameter d1' | Upset end Internal diameter d1' | Upset length not less than l1 |
Upset length not less than l2 |
Nominal | Extreme deviation | length for 1 m plaine end part of pipe | pipe weight increase by upsetting of both ends | |||
mm | mm | mm | mm | mm | mm | mm | mm | mm | mm | mm |
42±0.45 | +0.6 | 50 | 25 | 22 | 100 | 20 | 1500 | 100 -50 |
4.56 | 0,65 |
5.0 | 3000 | |||||||||
-0.5 | 4500 | |||||||||
50±0.45 | +0.66 | 55 | 32 | 28 | 110 | 25 | 1500 | 6.04 | 0,96 | |
5.5 | 3000 | |||||||||
-0.55 | 4500 | |||||||||
63.5±0.45 | +0.72 | 60 | 45 | 40 | 120 | 30 | 3000 | 8.51 | 1,57 | |
6.0 | 4500 | |||||||||
-0.6 | 6000 |